Production Process
Fuels Supply: All products are from certified produers who supply us with 100-200 liter drums.
Homogenisation: Before analyzing the materials a set of circulation pumps transfer the contents of one drum to another. This process takes about 24 hours.
Initial Validation: Before filling CRMs into bottles we send samples to our laboratory. Depending on the results we decide to use 250ml or 1000ml bottles.
Bottling: We fill bottles with our nitrogen pressurization system to ensure a completely safe working space. All bottles are closed with a teflon cap and a safety stopper.
Labelling: Afterwards CRMs are labelled with their product code, product number, production date and a bar code for traceable registration.
Analyzing, Testing: Homogeneity Analysis; Round Robin Test; Stability Analysis after one month
Certification: All bottles are supplied with certificates according ISO 5725-2
